A627013S
1. BOOM ASSEMBLY
Assemble the boom as shown below. Slide the appropriate end of BB
(figure A) into the slotted end of BA until the first holes align. Pin these
aligned holes temporarily with a machine screw (231) and slide worm
clamp (410) over BB onto the slotted end of tube BA and tighten. Push
the end caps (61 &13) onto the ends of the boom. Tighten clamp 410,
remove temporary screw (231) and return it to the parts bag.
BA
A270-
ALUM
1" x 32"
1
10SBA
TUBE
(2.5 x 81.3 cm)
BB
A270-
ALUM
7/8" x 48"
1
10SBB
TUBE
(2.2 x 121.92 cm)
BC
A6270-
ALUM
1-1/4" x 36"
1
13SBC
TUBE
(3 x 91.44 cm)
13
050013
PLASTIC
1-1/4"
1
CAP
(3 cm)
61
050061
PLASTIC
7/8"
1
CAP
(2.2 cm)
231
010231
SS MACHINE
8-32 x 1-3/4"
1
SCREW
(4.4 cm)
410
030410
WORM
7/16Ó-1"
1
CLAMP
(1.1-2.5 cm)
412
030412
WORM
11/16Ó-1-1/2"
1
CLAMP
(1.7-3.8 cm)
KEY
P/N DISPLAY
DESC
SIZE
QTY
KEY
P/N DISPLAY
DESC
SIZE
QTY
FIGURE A
3
MASTER PARTS LIST (continued)
KEY
PART #
DESCRIPTION
QUANTITY
103-1/2"
(262.8 cm)
412
410
BB
BA
BC
36"
(91.44 cm)
32"
(81.28 cm)
48"
(121.92 cm)
EJ
A27010SEJ
34-13/16" (88.4 cm) element rod
1
CB
A50CB
Connector Bracket Assembly
1
6MEA
A50EA
3/4Ó x 48" (1.9 x 121.9 cm) aluminum tubing slotted both ends /drilled
3
6MEB
A503SEB
5/8Ó x 37-1/2" (1.6 x 95.2 cm) aluminum tubing
2
6MEC
A503SEC
5/8Ó x 34-1/4" (1.6 x 86.9 cm) aluminum tubing
2
6MED
A503SED
5/8Ó x 31-1/2Ó (1.6 x 80 cm) aluminum tubing
2
RM1
A27010SRM1
5-1/2" (14 cm) Reddi-Match assembly for 2 meters
1
RM2
A270RM2
3-3/8" (8.6 cm) Reddi-Match assembly for 70 cm
1
RM3
A503SRM3
17Ó (41.2 cm) Reddi-Match assembly for 6 meter
1
FL
A27010SFL
Feedline harness
1
61
13
Holes need to align when together