402
A627013S
Mount the Reddi Match to the driven element as shown in figure G. The tuning strap (69)
should already be on the element. Slide the Reddi Match tube (RM3) through the tuning
strap (69). Connect the flattened rod to the screw on the connector. Attach the driven
element to the boom using U-bolt (402) with lock washer (84) and hex nut (85) with the
connector facing the director elements. Slide the poly tube over the rod up to the flattened
end. Adjust to the dimensions shown in Table B. Tighten all connectors.
7
5. 6 METER REDDI MATCH ASSEMBLY
9
010009
SS MACHINE
8-32 X 5/8"
2
SCREW
(1.59 cm)
41
011941
SS LOCK
#8
3
WASHER
11
010011
SS HEX
8-32
3
NUT
32
190032
U-BOLT
1-1/2"
1
BRACKET
(3.8 cm)
69
200069
TUNING
1
STRAP
KEY
P/N
DISPLAY
DESC
SIZE
QTY
85 010085
HEX
1/4"
2
NUT
(.63 cm)
84 010084
LOCK
1/4"
2
WASHER
(.63 cm)
402 010402
U-BOLTS
1-1/2"
1
(3.8 cm)
CB A50CB
CONNECTOR
1
BRACKET
RM3 A503-
REDDI MATCH
19"
1
SRM
TUBE
(48.3 cm)
KEY
P/N
DISPLAY
DESC
SIZE
QTY
69
9
11
41
11
CB
6MEA
32
RM3
84
85
X
SET
41
After the Reddi-Match tube has
been attached to the driven
element, adjust the angle of the
tuning strap (69) to a point which
brings the Reddi-Match tube into
parallel with the driven element.
6. BOOM TO MAST ASSEMBLY
Assemble and mount the mast bracket to the boom 6” (15.2 cm) from edge
of BC tube tube. Refer to figure H for assembly.
KEY P/N DISPLAY DESC SIZE QTY
45
321045
ALUM
1/2Ó x 1/2Ó
4
SPACER
(1.3 x 1.3 cm)
70
190070
MAST MT.
4" X 6"
1
PLATE
(10.16 x 15.2 cm)
84
010084
LOCK
1/4"
4
WASHER
(.63 cm)
85
010085
HEX
1/4"
4
NUT
(.63 cm)
104
010104
FLAT
1/4Ó
4
WASHER
(.63 cm)
118
010118
HEX
5/16"
4
NUT
(.8 cm)
119
010119
LOCK
5/16"
4
WASHER
(.8 cm)
326
290326
DANGER
1
LABEL
Figure G
Figure H
MAST
85
104
404
401
401
70
326
BC
84
45
119
BOOM
118
6"
4 PLACES
4 PLACES
4 PLACES
4 PLACES
4 PLACES
4 PLACES
(15
.2
cm
)
FRO
NT
2 PLACES
2 PLACES
KEY P/N DISPLAY DESC SIZE QTY
401
010401
U-BOLT
1-5/8"
2
(4.13 cm)
404
010404
U-BOLT
2-1/8"
2
(5.4 cm)