Custers Hydraulica B.V. Venray NL
7-jan-
21
www.custers.nl
11
Figure 9
9.
Place the second handrail frame as indicated in the picture.
Do this by pressing the frame with its claws from the inside to the outside on the
uprights.
Figure 10
10.
Again couple two four-stage-frames to each other and secure them with the locking clips.
Hang the composed frames on the arm.
11.
Hang two handrail frames on the arms to the other side.
12.
Climb through the hatch and sit on the edge of the hole. Mount the handrail frames.
13.
The platform floor can now be assessed.