Custers Hydraulica B.V. Venray NL
7-jan-
21
www.custers.nl
6
5.4.
Lifting the parts
Lifting parts for higher sections must be done by passing the parts from platform to platform.
The Amigo floor boards have extendable arms. All parts can be hung on these arms.
Figure 1
5.5.
Stabilisers and outriggers
The stabilisers indicated in the table must always be installed as soon as the lower travel of
the scaffolding has been assembled. When assembling, the upper sides of the stabilisers
must be connected to the underside of the rungs in order to prevent them from
inadvertently sliding upwards.
The basic shapes shown below must be strictly adhered to!
If the prescribed shape deviates from this, ballast weights may have to be fitted; please
contact the manufacturer/supplier for this.