14
Page 2
–Load Priority
1(Utility)
2(PV)
ESC
1(Utility)
If setting
“Utility” priority,
utility will provide power to
loads as first priority. Solar
and battery energy will
provide power to loads only
when utility power is not
available.(default)
If setting
“PV” priority, solar
energy will provide power to
loads as first priority. If solar
energy is not sufficient to
power all connected loads,
battery energy will supply
power to the loads at the
same time.
Utility provides power to the
loads only when any one
condition happens:
-Solar energy is not
available
-Battery voltage drops to the
low-level warning voltage or
the setting voltage point in
program P04
Page 3
–Charger Priority
1(Both)
2(Utility)
3(PV)
ESC
1(Both)
If setting
“Both”, the solar
power and utility power
charging the battery
together.(default)
Summary of Contents for CPS1200EO12LCD