15
If setting
“Utility”, the utility
power charging the battery
first. Solar energy will charge
battery only when utility
power is not available.
If setting
“PV”, the solar
power charging the battery
first. Utility energy will
charge battery only when
solar power is not available.
Page 4
–Setting voltage point
back to utility mode from PV
mode
Note: This setting voltage cannot be
higher than that in P05 program
CPS1200EO12L
CD:11.0/11.3
/11.5/11.8
/12.0/12.3
/12.5/12.8V
CPS2200EO24L
CD:22.0/22.5
/23.0/23.5
/24.0/24.5
/25.0/25.5V
ESC
11.5V(23.
0V for
CPS2200
EO24LCD
)
Unit works in PV mode, if
solar power is not sufficient
to supply loads, the battery
will power loads at the same
time. When battery voltage
drops to the setting voltage
point, unit will transfer to
utility mode.
Page 5
–Setting voltage point
transfer to PV mode from utility
mode
Note: This setting voltage cannot be
lower than that in P04 program
CPS1200EO12L
CD:FUL/12.0/12.
3/12.5/
12.8/13.0
/13.3/13.5V/ESC
CPS2200EO24L
CD:FUL/24.0/24.
5/25.0/25.5/26.0
/26.5/27.0V/ESC
13.5V(27.
0V for
CPS2200
EO24LCD
)
When selecting
“PV” priority
for load, if solar power is not
sufficient to supply loads,
and battery voltage drops to
the setting voltage point in
P04, unit will transfer to
utility mode. When battery
voltage is charging up to the