After pressing and holding ENTER button for 3 seconds, the unit will enter setting mode. Press “UP” or “DOWN” button to
select setting programs. And then, press “ENTER” button to confirm the selection or ESC button to exit.
Setting Programs:
Program
Description
Setting Option
01
Output source priority: To
configure load power
source priority
Solar first
Solar energy provides power to the loads as first priority.
If solar energy is not sufficient to power all connected loads,
battery energy will supply power the loads at the same time.
Utility provides power to the loads only when any one condition
happens:
-
Solar energy is not available
-
Battery voltage drops to either low-level warning voltage or the
setting point in program 12.
Utility first (default)
Utility will provide power to the loads as first priority.
Solar and battery energy will provide power to the loads only
when utility power is not available.
SBU priority
Solar energy provides power to the loads as first priority.
If solar energy is not sufficient to power all connected loads, battery
energy will supply power to the loads at the same time.
Utility provides power to the loads only when battery voltage drops
to either low-level warning voltage or the setting point in program
12.
02
Maximum charging current: To
configure total charging
current for solar and utility
chargers.
(Max. charging current = utility
charging c solar
charging current)
CPS5000ECH48A/CPS5000ECH48A-P: default 60A, 10A~140A
settable
CPS3000ECH48A: default 30A, 10A~45A settable
03
AC input voltage range
Appliance (default)
If selected, acceptable AC input voltage
range will be within 90~280VAC
UPS
If selected, acceptable AC input voltage
range will be within 170~280VAC
Generator
If selected, acceptable AC input voltage
range will be within 90~280VAC
Summary of Contents for CPS3000ECH48A
Page 1: ...ALL IN ONE OFF GRID INVERTER User s Manual CPS3000ECH48A CPS5000ECH48A CPS5000ECH48A P ...
Page 2: ......
Page 42: ...39 Note ...
Page 43: ...40 Note ...