User Manual 17 / 61 CPS Mini Central series
5.2 Selecting the Installation Location
This is guidance for installer to choose a suitable installation location, to avoid potential damages to device and
operators.
1)
The wall selected to install the inverter must be strong and firm enough to support and bear the weight
of the inverter for a long period time. (Refer to Chapter 11 Specifications)
2)
The location selected must be suitable for inverters’ dimension. (Refer to 3.3 Dimensions and Fig.5.2
Required Clearances)
3)
Do not install the inverter on structures constructed of flammable or thermo labile materials.
4)
Never install the inverter in environment of little or no air flow, nor dust environment.
5)
The Ingress Protection rate is IP65 which means the inverter can be installed outdoors and indoors.
6)
Do not expose the inverter to direct sunlight, in order to avoid the power and efficiency derating caused
by excessive heating.
7)
The humidity of the installation location should be 0~95% without condensation.
8)
The ambient temperature of the inverter should be -25
℃
~+60
℃
.
9)
The installation location must be freely and safely to get at all times.
10)
Vertically installation and make sure the connection of inverter must be downwards. Never install
horizontal and avoids forward and sideways tilt.( Refer to drawings below)
Fig 5.1
11)
Notice the minimum clearances of the inverter. (Refer to 3.3 Dimensions and Fig.5.2 Required
Clearances).