Installing the System
Positioning the SE 300 Ultra System
Adjust the height of the system to align with incoming and outgoing conveyor sections. Use
the fixed front rail conveyor on the SE 300 Ultra for alignment.
➢
To align the system with other conveyors
1. Ensure that the floor is free of debris and the area provides adequate clearance on all sides
of the unit.
2. Push the SE 300 Ultra unit into position, lining up the front rails of the incoming and
outgoing conveyor sections.
3. To adjust the leveling feet loosen the locking nut with a wrench and then turn the
adjustment nut.
●
Turn the nut clockwise to raise the unit
●
Turn the nut counter-clockwise to lower the unit
Figure 23.
Leveling Foot
4. Use a level or machine height measurements to make sure that the system is level.
5. Manually slide a panel through the incoming and outgoing conveyor sections to make sure
that the SE 300 Ultra conveyor rail is properly aligned. The panel should pass from the
upstream conveyor through the SE 300 Ultra system and on to the downstream conveyor
without any resistance.
6. After adjusting the leveling feet, tighten the locking nuts.
i
Note:
Do not bolt the SE 300 Ultra conveyors to incoming and outgoing conveyor sections.
Vibrations from other machines may impact SE 300 Ultra performance.
Locking nut
Adjustment nut
i
See page 140 for information about replacing damaged leveling feet.
Summary of Contents for SE 300 Ultra
Page 1: ...SE 300 Ultra Hardware Reference ...
Page 9: ...CyberOptics Corporation 1 Safety Safety Guidelines 2 Safety and Conformity Labeling 4 ...
Page 18: ...Chapter 1 Safety 10 SE 300 Ultra Hardware Reference ...
Page 96: ...Chapter 4 Running an Inspection 88 SE 300 Ultra Hardware Reference ...
Page 160: ...Chapter 7 Warranty and Spare Parts 152 SE 300 Ultra Hardware Reference ...