Maintenance Schedule
Perform the maintenance procedures in this section as specified in the maintenance schedule
below. Perform maintenance more frequently as required, based on machine usage.
Table 10.
Maintenance Schedule
Warning:
To prevent the risk of injury, turn the AC main circuit breaker to OFF to shut down all
electrical power to the SE500
CP
before starting any replacement operations. For more
information, refer to the section “
Maintenance
Monthly
Annually
Page
Every 3 months
Every 3 months
Clean the Main Electrical Panel
Every 3 months
Cleaning the Air Regulator Filters
Every 3 months
Every 3 months
Every 3 months
Every 3 months
Checking the Emergency Stop Functionality
Once a month
Lubricate the Gantry and Z-Stage
Every 3 months
Replacing the Conveyor Edge Strip Guides
Once a year
Once a year
Every 3 years
Every 3 months
Once a month
Frequency
Summary of Contents for SE500CP
Page 1: ...SE500CP Hardware Manual ...
Page 6: ...Contents vi SE500CP Hardware Manual ...
Page 10: ...x SE500CP Hardware Manual ...
Page 170: ...Index 160 SE500CP Hardware Manual ...