background image

 

4  Bolt Middle Beam to Frame A and Frame B 

Middle Beam 

 

Bolt below plate 

M10 x 20mm hex bolt 

 

Hand Tighten 

M10 serrated flange nut 

 

 

 

 

 

 

5  Loosely bolt Roof Panel 4 to side frame to hold it in place. 

Roof Panel 3 

 

Hook Roof Panel 3 over Top Beam lip. 

Roof Panel 4 

 

Overlay Roof Panel 3 over Roof Panel 4 and bolt through frame. 

M8 x 20mm mushroom 
head coach bolt 

24 

 

Fix remaining bolts to panels and frame. 

M8 serrated flange nut 

24 

 

 

M8 rubber washer 

24 

 

 

 

 

 

 

 

 

 

Summary of Contents for Bikehanger

Page 1: ...lter Feet A 2 Mushroom head coach bolt faces externally on rear side of shelter Feet B 2 Repeat with Frame B M10 x 65mm mushroom head coach bolt 4 M10 shear nut 4 2 Bolt Top Beam to Frame A and Frame B Top Beam 1 Hand Tighten M10 x 30mm mushroom head coach bolt 4 M10 serrated flange nut 4 3 Bolt Bottom Beam to Frame A and Frame B Bottom Beam 1 Bolt above plate M10 x 20mm hex bolt 2 Hand Tighten M1...

Page 2: ...ange nut 2 5 Loosely bolt Roof Panel 4 to side frame to hold it in place Roof Panel 3 1 Hook Roof Panel 3 over Top Beam lip Roof Panel 4 1 Overlay Roof Panel 3 over Roof Panel 4 and bolt through frame M8 x 20mm mushroom head coach bolt 24 Fix remaining bolts to panels and frame M8 serrated flange nut 24 M8 rubber washer 24 ...

Page 3: ... mushroom head coach bolt 9 M10 serrated flange nut 9 8 Bolt High Wheel Holders to Bike Rack Beam A and Bike Rack Beam B High Wheel Holder 3 Hand Tighten M10 x 20mm mushroom head coach bolt 6 M10 serrated flange nut 6 9 Bolt Locking Bars to Bike Rack Beam A and Bike Rack Beam B Locking Bar 3 Tighten Shear Nuts until ends snap off M10 x 20mm mushroom head coach bolt 12 Lift up rack to tighten M10 s...

Page 4: ...2 M10 serrated flange nut 2 11 Bolt Bike Rack Beam A and Bike Rack Beam B to Frame A and Frame B M10 x 20mm hex bolt 8 Hand Tighten M10 serrated flange nut 8 12 Bolt Joining Plate to Bottom Beam M10 x 20mm hex bolt 2 Hand Tighten M10 serrated flange nut 2 Tighten all bolts with impact wrench ...

Page 5: ...rings to Frame A and Frame B Gas Spring 2 Note Connect piston rod end not cylinder end M10 Nylock nut 2 14 Bolt Door Hinges to Door Frame Door Frame 1 Nut on inside Door Hinge 2 M12 nylock nut 4 M12 x 30mm hex bolt 4 ...

Page 6: ...15 Bolt Door Hinges to Top Beam M12 x 60mm A2 st st hex head bolt 45mm NOT thread 2 Apply grease to bolt M12 nylock nut 2 16 Bolt Gas Springs to Door Hinges through middle hole M10 Nylock nut 2 ...

Page 7: ...t in place Roof Panel 1 1 Overlay Roof Panel 2 over Roof Panel 1 Roof Panel 2 1 Bolt Lock front cover to Locking box through frame M8 x 20mm mushroom head coach bolt 32 Fix remaining bolts to panels and frame M8 serrated flange nut 32 M8 rubber washer 32 ...

Page 8: ...h Door Frame Locking Bar 2 Note Rotate locking bar to correct position Adjust length so end clears side frame by 5mm when open M12 nut 4 20 Attach Lock Handle to Lock Use loctite 21 Bolt External Handle to Door Frame External Handle 1 M10 serrated flange nut 2 22 Fix Nutserts to Door Frame M6 x 15mm Nutsert 10 23 Attach Lock Cover Plate to Door Frame Lock Cover Plate 1 M6 x 12mm button head socket...

Reviews: