4 Bolt Middle Beam to Frame A and Frame B
Middle Beam
1
Bolt below plate
M10 x 20mm hex bolt
2
Hand Tighten
M10 serrated flange nut
2
5 Loosely bolt Roof Panel 4 to side frame to hold it in place.
Roof Panel 3
1
Hook Roof Panel 3 over Top Beam lip.
Roof Panel 4
1
Overlay Roof Panel 3 over Roof Panel 4 and bolt through frame.
M8 x 20mm mushroom
head coach bolt
24
Fix remaining bolts to panels and frame.
M8 serrated flange nut
24
M8 rubber washer
24