background image

 

18  Assemble Lock with Lock L plates 

Camlock 

 

Attach Locking Mechanism and Lock Front Cover through Door Frame 

Lock L Plates 

 

Apply Grease to Locking Mechanism 

 

 

 

 

 

 

19  Attach Locking Bars to L-Brackets and through Door Frame 

Locking Bar 

 

Note: Rotate locking bar to correct position. Adjust length so end clears 
side frame by 5mm when open 

M12 nut 

 

 

 

 

 

 

20  Attach Lock Handle to Lock  

 

 

 

Use loctite 

 

 

 

 

 

 

21  Bolt External Handle to Door Frame 

External Handle 

 

 

M10 serrated flange nut 

 

 

 

 

22  Fix Nutserts to Door Frame 

M6 x 15mm Nutsert 

10 

   

 

 

23  Attach Lock Cover Plate to Door Frame 

Lock Cover Plate 

   

M6 x 12mm button head 
socket screw 

10 

 

 

 

Summary of Contents for Bikehanger

Page 1: ...lter Feet A 2 Mushroom head coach bolt faces externally on rear side of shelter Feet B 2 Repeat with Frame B M10 x 65mm mushroom head coach bolt 4 M10 shear nut 4 2 Bolt Top Beam to Frame A and Frame B Top Beam 1 Hand Tighten M10 x 30mm mushroom head coach bolt 4 M10 serrated flange nut 4 3 Bolt Bottom Beam to Frame A and Frame B Bottom Beam 1 Bolt above plate M10 x 20mm hex bolt 2 Hand Tighten M1...

Page 2: ...ange nut 2 5 Loosely bolt Roof Panel 4 to side frame to hold it in place Roof Panel 3 1 Hook Roof Panel 3 over Top Beam lip Roof Panel 4 1 Overlay Roof Panel 3 over Roof Panel 4 and bolt through frame M8 x 20mm mushroom head coach bolt 24 Fix remaining bolts to panels and frame M8 serrated flange nut 24 M8 rubber washer 24 ...

Page 3: ... mushroom head coach bolt 9 M10 serrated flange nut 9 8 Bolt High Wheel Holders to Bike Rack Beam A and Bike Rack Beam B High Wheel Holder 3 Hand Tighten M10 x 20mm mushroom head coach bolt 6 M10 serrated flange nut 6 9 Bolt Locking Bars to Bike Rack Beam A and Bike Rack Beam B Locking Bar 3 Tighten Shear Nuts until ends snap off M10 x 20mm mushroom head coach bolt 12 Lift up rack to tighten M10 s...

Page 4: ...2 M10 serrated flange nut 2 11 Bolt Bike Rack Beam A and Bike Rack Beam B to Frame A and Frame B M10 x 20mm hex bolt 8 Hand Tighten M10 serrated flange nut 8 12 Bolt Joining Plate to Bottom Beam M10 x 20mm hex bolt 2 Hand Tighten M10 serrated flange nut 2 Tighten all bolts with impact wrench ...

Page 5: ...rings to Frame A and Frame B Gas Spring 2 Note Connect piston rod end not cylinder end M10 Nylock nut 2 14 Bolt Door Hinges to Door Frame Door Frame 1 Nut on inside Door Hinge 2 M12 nylock nut 4 M12 x 30mm hex bolt 4 ...

Page 6: ...15 Bolt Door Hinges to Top Beam M12 x 60mm A2 st st hex head bolt 45mm NOT thread 2 Apply grease to bolt M12 nylock nut 2 16 Bolt Gas Springs to Door Hinges through middle hole M10 Nylock nut 2 ...

Page 7: ...t in place Roof Panel 1 1 Overlay Roof Panel 2 over Roof Panel 1 Roof Panel 2 1 Bolt Lock front cover to Locking box through frame M8 x 20mm mushroom head coach bolt 32 Fix remaining bolts to panels and frame M8 serrated flange nut 32 M8 rubber washer 32 ...

Page 8: ...h Door Frame Locking Bar 2 Note Rotate locking bar to correct position Adjust length so end clears side frame by 5mm when open M12 nut 4 20 Attach Lock Handle to Lock Use loctite 21 Bolt External Handle to Door Frame External Handle 1 M10 serrated flange nut 2 22 Fix Nutserts to Door Frame M6 x 15mm Nutsert 10 23 Attach Lock Cover Plate to Door Frame Lock Cover Plate 1 M6 x 12mm button head socket...

Reviews: