5-16-12 x 1-1/4" Washer Head
ALWAYS OBSERVE POSTED SAFETY GUIDELINES
WHEN ASSEMBLING THIS PRODUCT. ALWAYS WEAR SAFETY GLASSES
10214
5/16-18NC x 1-1/4" S/S Hex Bolt
B,C,I
6,6,4
10219
5/16-18NC x 3/4" S/s Hex Bolt
B
10
1/4" S/S Tek Screw x 1-1/4"
10222
B
14
10217
A,C
8,6
10304
10211
3/8-16NC x 1-7/8" Concrete Lag
A,C
4,2
10218
5/16" S/S Flat Washer
B,C
6,6
10909
3/8" S/S Flat Washer
A,C
4,2
Tools Required
Fasteners Required
Photo
Part # Description
Supplied by the Contractor
Kit A = End Panel & Anchor Bolts
Kit C = Vertical, Horizontal Frames & Dividers
Kit I = Interior Door Brace Assembly
Kit B = Door, Top & Center Panels
Assembly Sequence
Kit #
Qty
10708
5/16-18NC x 1" Carriage Bolt
C
8
5/16-18NC S/S Flare Nut
B,C,I
10,8,4
10221
5/16" Tinnerman Clip
B
6
NOTE:
Keep the assembly Square and Plumb during
the assembly steps.
Special effort must be taken ot record the
corresponding Key with Locker Door.
A
Assemble, anchor
and level the entire
lower tier locker row.
B
Pre-Assemble Riser
Blocks with nuts and
bolts
C
Attach Riser Blocks
D
Pre-Assemble Major
Components.
E
Install Leveling
Plates toRiser Blocks
F
Install Major
Components: End
Panels, Frames,
Partitions
G
Install Door Braces
and square the Locker
and Fit Top Panels and
Doors
H
Adjust the Doors,
Level the Locker &
Attach to the
Leveling Plates
Power Drill Motor w/ Clutch
Hammer Drill Motor
Tape Measure
Carpenter's pencil
Carpenter's Square
Carpenter's Level
Short 10" or 12" Level
Flat & Philips Screwdriver
Slip-joint Plier Set
3/8" Drill Motor Adapter
3/8" Ratchet & Extension
3/8" Drive Deep Well Sockets
3/8" Drill Motor Adapter
Chalk Line
Small Dia Drift Pin
Hex Drive Set
T-40 Star Drive Bit
Small Hand Brush
Shop Vacuum
5/16" Twist Drill Bit
3/8" Concrete Drill Bit
Contractor's Adhesive
Portable Electric Generator
Electrical Extension Cords
ProPark Series {Upper} Tier Installation Guide
Page 4 of 13