Cynko
Met
T-149
44
4.3 Rules of proper use of trailers.
4.3.1 Preparation before running for the first time.
4.3.1.1 Control of the trailer after delivery
The manufacturer guarantees that the trailer is
fully operational and has been checked according to
quality control procedures and is approved for use.
However, this does not relieve the user from the
obligation of checking the vehicle after delivery and
before first use. The machine is provided to the user in a
fully assembled state.
Before starting work, the operator of the trailer
must inspect the technical condition of the trailer and
prepare it for the first run. Please refer to this manual
attached to the trailer and follow the recommendations
contained in it, take a look at the design and understand
the principle of operation of the machine.
CAUTION!
CAUTION!
Before connecting and before starting the trailer,
read this manual and follow the instructions
contained therein.
Visual inspection:
Check the completion of the machine (standard and optional
equipment).
Check the condition of the anti-corrosion coatings.
Perform a visual inspection of the individual components of
the trailer for mechanical damage resulting inter alia due to
improper transport of machines (dents, piercing, bending or
broken components).
Summary of Contents for T-149
Page 4: ...CynkoMet T 149 4...
Page 29: ...CynkoMet T 149 29 Figure 4 Distribution of stickers...
Page 82: ...CynkoMet T 149 82 Fig 20 Lubrication diagram 1 2 2 3 4 5 5 6 6 7 8 9 9 10 11 12 12 14 13 15 16...
Page 95: ...CynkoMet T 149 95 SPARE PARTS CATALOGUE...
Page 96: ...CynkoMet T 149 96...
Page 100: ...CynkoMet T 149 100 Push torsion system...
Page 102: ...CynkoMet T 149 102 Suspension...
Page 104: ...CynkoMet T 149 104 Spring suspension...
Page 106: ...CynkoMet T 149 106 Wheel fender...
Page 108: ...CynkoMet T 149 108 Water tank...
Page 110: ...CynkoMet T 149 110 Upper frame...
Page 112: ...CynkoMet T 149 112 Rear closure...
Page 114: ...CynkoMet T 149 114 Closure flexible connector...
Page 116: ...CynkoMet T 149 116 Walls set...
Page 118: ...CynkoMet T 149 118 Rear wall...
Page 120: ...CynkoMet T 149 120 Extensions set...
Page 122: ...CynkoMet T 149 122 Center extensions set...
Page 124: ...CynkoMet T 149 124 Hydraulic installation...
Page 126: ...CynkoMet T 149 126 Hydraulic installation continued...
Page 128: ...CynkoMet T 149 128 Two wire pneumatic installation...
Page 132: ...CynkoMet T 149 132 Handbrake...
Page 134: ...CynkoMet T 149 134 The handbrake mechanism...
Page 136: ...CynkoMet T 149 136 Toolbox...
Page 138: ...CynkoMet T 149 138 Front platform...
Page 140: ...CynkoMet T 149 140 Tarpaulin frame...
Page 142: ...CynkoMet T 149 142 Tarpaulin...
Page 144: ...CynkoMet T 149 144 Electrical installation...
Page 146: ...CynkoMet T 149 146 Hanger protection of the lighting...
Page 148: ...CynkoMet T 149 148 NOTES...