Cynko
Met
T-149
47
4.3.2 Preparation for work.
In preparation for work, the following should be
checked:
the wear of the tires and driving wheels,
Air pressure in the tires,
springs condition, and in particular the completeness of the
feathers
tightening the nuts fixing the discs of the driving wheels to
wheel hubs and the condition of other screw connections.
In addition, after combining the machine with the
tractor check:
the efficiency of the electrical system and lighting system and
trailer signaling,
the effectiveness of the brake system,
the correct operation of the hydraulic discharge
mechanism through trial tilting of the load crate
backwards or sideways.
4.3.3 Connecting and disconnecting with the
tractor.
The trailer can be connected to the tractor, if all
connections (electrical, pneumatic, hydraulic), and a hook in
the agricultural tractor shall comply with the requirements of
the manufacturer of the trailer.
In order to connect the trailer to the tractor, perform
the following steps:
Prior to coupling with tractor, check if the trailer is braked with
the parking brake.
Summary of Contents for T-149
Page 4: ...CynkoMet T 149 4...
Page 29: ...CynkoMet T 149 29 Figure 4 Distribution of stickers...
Page 82: ...CynkoMet T 149 82 Fig 20 Lubrication diagram 1 2 2 3 4 5 5 6 6 7 8 9 9 10 11 12 12 14 13 15 16...
Page 95: ...CynkoMet T 149 95 SPARE PARTS CATALOGUE...
Page 96: ...CynkoMet T 149 96...
Page 100: ...CynkoMet T 149 100 Push torsion system...
Page 102: ...CynkoMet T 149 102 Suspension...
Page 104: ...CynkoMet T 149 104 Spring suspension...
Page 106: ...CynkoMet T 149 106 Wheel fender...
Page 108: ...CynkoMet T 149 108 Water tank...
Page 110: ...CynkoMet T 149 110 Upper frame...
Page 112: ...CynkoMet T 149 112 Rear closure...
Page 114: ...CynkoMet T 149 114 Closure flexible connector...
Page 116: ...CynkoMet T 149 116 Walls set...
Page 118: ...CynkoMet T 149 118 Rear wall...
Page 120: ...CynkoMet T 149 120 Extensions set...
Page 122: ...CynkoMet T 149 122 Center extensions set...
Page 124: ...CynkoMet T 149 124 Hydraulic installation...
Page 126: ...CynkoMet T 149 126 Hydraulic installation continued...
Page 128: ...CynkoMet T 149 128 Two wire pneumatic installation...
Page 132: ...CynkoMet T 149 132 Handbrake...
Page 134: ...CynkoMet T 149 134 The handbrake mechanism...
Page 136: ...CynkoMet T 149 136 Toolbox...
Page 138: ...CynkoMet T 149 138 Front platform...
Page 140: ...CynkoMet T 149 140 Tarpaulin frame...
Page 142: ...CynkoMet T 149 142 Tarpaulin...
Page 144: ...CynkoMet T 149 144 Electrical installation...
Page 146: ...CynkoMet T 149 146 Hanger protection of the lighting...
Page 148: ...CynkoMet T 149 148 NOTES...