Step
Action
7
Wait for the
CCD status to turn green, which shows that the CCD has been
cooled to the target temperature.
Result:
Image capturing can begin.
Start the system using an external
monitor
It is also possible to start the system via the external PC if an external monitor is being
used. To do this, use the following procedure.
Step
Action
1
Make sure that the instrument is plugged in to a mains power supply.
2
Press the power button on the right side of the instrument to activate it.
Result:
The instrument's self-diagnostic process will initialize.
Note:
The self-diagnostic process will normally take approximately 5 minutes.
Connection to a network may take longer.
5 Operation
5.1 Start the Amersham ImageQuant 800
72
Amersham ImageQuant 800 Operating Instructions 29372604 AC
Summary of Contents for AKTA go
Page 129: ...Pageintentionallyleftblank...