PACKING PUMP
P-201
PACKING
BUFFER
SLURRY
COLLECTION
UNPACKING PUMP
P-202
XV-021A
XV-021C
XV-022A
XV-022C
SOT
SOB
MPB
MPT
COLUMN
SIT
SIB
PSV-371
A
B
C
D
EXTENT OF PACKING STATION
P
PSV
PSV
SOV
SOV
NOTICE
The pressure safety equipment indicated in blue in the diagram
above is not provided as part of the Chromaflow Packing Station
delivery. The diagram indicates the recommended placement of
suitable pressure safety equipment when connecting a column to a
system to perform chromatography applications, or to perform
sanitization-in-place. It is the responsibility of the user to install
suitable pressure safety equipment to protect the column from
exposure to overpressure or vacuum.
Step
Action
1
Install pressure safety valves (
PSV) on the MPT and MPB ports. The valves
should have the same inner diameter as the column inlet/outlet.
2
Connect a pressure gauge (
P, recommended range 0 to 6 bar) to MPB after
the pressure safety valve in the flow path leading from the column.
3
In the flow path leading from the column perform the following actions:
•
Install a shut-off valve (
SOV) after the pressure gauge (P) on MPB.
•
Install a shut-off valve (
SOV) after the pressure safety valve (PSV) on
MPT.
4
Connect tubing from the
MPB and MPT shut-off valves to drain.
4 Installation
4.5 Setup
4.5.5 Connect a column
Chromaflow Packing Station 50, 100, 200, and 400 Operating Instructions 29046228 AD
55
Summary of Contents for Chromaflow 100
Page 97: ...Pageintentionallyleftblank...