CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 8 – LANDING GEAR
Date of issue: 2013-10-09
Revision No.: 7
8 - 23
(h) Gradually install on the tube end (1) washers (5; 7; 6; 8), screw and tighten the nut (9);
secure it with the new cotter pin (10).
(i) Put the lower end of the tube (1) to the bracket (16); install the bolt (11) with the nut (13)
and washers (12), secure nut with the new cotter pin (10).
(j) Lower the airplane on jacks.
1 Tube
11 Bolt
2 Shock absorber
12 Washer
3 Washer
13 Nut
4 Washer
14 Tube
5 Washer
15 Cotter pin
6 Washer
16 Nose leg bracket
7 Rubber washer
17 Bracket
8 Washer
18 Profile
9 Nut
19 Case
10 Cotter pin
Fig. 8-17
: Change of the dumping elements in the nose landing gear