PS-28 Cruiser
PS-28N Cruiser
CR-MM-1-0-00
CHAPTER 11 – ELECTRICAL SYSTEM
Revision No.: -
Date of issue: 2011-03-08
11 - 12
(e) Install the engine cowlings.
1 Battery
6
Washer
2 Wire
7
Battery strap
3 Wire
8
Bolt
4 Wire
9
Washer
5 Bolt
10 Firewall
Fig. 11-3
: Battery removal / installation
11.3.4 Position / strobe light removal
Type of maintenance: line
Authorization to perform:
-
Sports pilot or higher
Tools needed:
-
screwdriver
(a) Set the
MASTER BAT
,
NAV L
, and
STROBE
switches to OFF.
(b) Unscrew the screw (4, Fig. 11-4) and carefully release the light (1).
(c) Disconnect the wires (3) and remove position / strobe light (1) with the gasket (2).