CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 2 – TIME LIMITS / MAINTENANCE CHECKS
Date of issue: 2020-11-19
Revision No.: 24
2 - 3
2B
Inspection and Maintenance
2B.1 Overhaul Schedule
ITEM
INTERVAL
PROCEDURE
NOTE
1
Engine
2,000 FH or 15 years
OVERHAUL
W
hichever comes first.
See OM for Engine Type
912 Series.
2
Woodcomp Klassic
170/3/R propeller
1,000 OH or 72 months
OVERHAUL
W
hichever comes first.
3
All other items
On condition or as
stated in the respective
maintenance / overhaul
manual.
OVERHAUL
NOTE:
Inspections must be performed by Certifying staff (EU 1321 / 2014).
In addition to the overhaul schedule mentioned above, Woodcomp propeller must be
inspected also after first 25 hrs of propeller operation, after every new propeller installation and
after each 100 hrs of aircraft operation or 12 months (whichever comes first), and
after every
new propeller installation.
See also last instructions issued by the propeller manufacturer (
2B.2 Periodic Inspection Schedule
ITEM
INTERVAL
PROCEDURE
NOTE
1
Sensenich
3B0R5R68C
propeller
2,000 OH
PERIODIC
INSPECTION
No specified overhaul time.
The propeller parts are
removed from service when
they can no longer meet the
Continued Airworthiness
Requirements
NOTE:
Inspections must be performed by Certifying staff (EU 1321 / 2014).
In addition to the inspection schedule mentioned above, Sensenich propeller must be
inspected also after first 25 hrs of propeller operation, after every new propeller installation and
after each 100 hrs of aircraft operation or 12 months (whichever comes first), and
after every
new propeller installation.
See also last instructions issued by the propeller manufacturer (
2B.3 Replacement Schedule
ITEM
INTERVAL
PROCEDURE
NOTE
1
AEPS parachute
6 years
REPACK