PS-28 Cruiser
PS-28N Cruiser
CR-MM-1-0-00
CHAPTER 13 – VENTING / HEATING
Revision No.: 6
Date of issue: 2013-01-11
13 - 8
13.3.7
Defogging blowers removal
Type of maintenance: line
Authorization to perform:
-
Sports pilot or higher
Tools needed:
-
Screwdriver, pliers, cutting pliers
(a) Set the MASTER BAT,
BLOWERS
switches to OFF.
(b) As required, remove the instrument panel cover (9) and hoses (5; 6).
(c) Disconnect the blower wires from the wiring harness.
(d) Unscrew and remove the screws (4, Fig. 13-7), blower guard (2), spacers (3); and remove
the blower (1).
13.3.8
Defogging blowers installation
Type of maintenance: line
Authorization to perform:
-
Sports pilot or higher
Tools needed:
-
Screwdriver, pliers, cutting pliers
(a) Align the guard (2, Fig. 13-7) on the blower (1), insert the screws (4) into the holes and
install the spacers (3).
(b) Parts align to the appropriate place and tighten the screws (4).
(c) Connect the blower wires to the wiring harness (see Wiring Manual).
(e) As required, install hoses (5; 6) and the instrument panel cover (9).
(f) Set the MASTER BAT,
BLOWERS
switches to ON and carry out operational test.