PS-28 Cruiser
PS-28N Cruiser
CR-MM-1-0-00
CHAPTER 2 – TIME LIMITS / MAINTENANCE CHECKS
Revision No.: 24
Date of issue: 2020-11-19
2 - 10
SCHEDULED ANNUAL PERIODICAL INSPECTION (API) OR
INSPECTION AFTER 100 FH or OH
Aircraft S/N: ………………….
TSN (OH): ………………….
Registration mark: ………………….
TSN (cycles): ………………….
Page: 4 of 8
Chpt.
Prescribed works
API /
100
FH /
OH
Made
by
Checked
by
6
Control
Ailerons and Elevator Control
Both
FH
Check for free travel of control (see 6.4.2).
Both
FH
Check plays (see 6.4.1).
Both
FH
Check securing of links.
Both
FH
Check condition of the stops.
Both
FH
Rudder Control
Check free play of control (see 6.4.2).
Both
FH
Check plays (see 6.4.1).
Both
FH
Check securing of turnbuckles.
Both
FH
Check condition and attachment of pedal springs.
Both
FH
Check condition and tension of cables (see 6.4.5).
Both
FH
Check adjustment of pedals and full deflections in all
position.
Both
FH
Flaps Control
Check for free travel of the control lever.
Both
FH
Check securing of links.
Both
FH
Check condition of control actuator and position
indicator.
Both
FH
Control of the Pitch and Roll Trim Tab
Check condition of the control actuators and position
indicators.
Both
FH
Check plays (see 6.4.1).
Both
FH
Check securing of links.
Both
FH
Check trim tab neutral position adjustment.
Both
FH
7
Equipment
Check cleanness and condition of upholstery.
Both
FH
Check condition of seats.
Both
FH
Check condition, damage, function and attachment
of safety harnesses and straps in baggage
compartment.
Both
FH
Check condition and attachment of ELT.
Both
FH
Check attachment and security of BRS parachute
container and rocket.
Both
FH
Check security and routing of airframe BRS bridles.
Both
FH
Check attachment, security and routing of BRS
activating handle.
Both
FH
Check attachment of egress cover.
Both
FH