CHAPTER 2 – TIME LIMITS / MAINTENANCE CHECKS
Date of issue: 2021-01-15
Revision No.: 25
2 - 13
SCHEDULED ANNUAL PERIODICAL INSPECTION (API) OR
INSPECTION AFTER 100 FH or OH
Aircraft S/N: ………………….
TSN (OH): ………………….
Registration mark: ………………….
TSN (cycles): ………………….
Page: 7 of 8
Chpt.
Prescribed works
API /
100
FH /
OH
Made
by
Checked
by
10
Engine and Propeller - continued
Remove and clean oil tank; install the tank back -
applied for annual inspection only.
API
OH
11
Electrical System
Check attachment and condition of battery.
Both
FH
Check level of battery charge.
Both
FH
Perform battery capacity test - applied for annual
inspection only.
API
FH
Check condition, attachment and integrity of wiring.
Both
FH
Check condition and securing of plug/socket outlets.
Both
FH
Check condition of switches, fuses and circuit
breakers.
Both
FH
Check condition of the landing light.
Both
FH
Check condition of the position / strobe lights.
Both
FH
12
Instruments and Avionics
Check general condition and attachment of the
instrument panel.
Both
FH
Check condition and attachment of instruments.
Both
FH
Check condition and attachment of the pitot tube.
Both
FH
Check cleanness of air inlet holes of pitot tube.
Both
FH
Check attachment and securing of hoses to the
instruments.
Both
FH
Check for pitot-static system tightness (see 12.4.1)
(with 2 years periodicity).
2 yr
FH
Visually check condition of navigation and
communication instruments.
Both
FH
Perform compensation of magnetic and EFIS
compass - applied for annual inspection only.
API
FH
Check condition of COMM, ELT, XPDR, NAV
antennas and OAT probe.
Both
FH
Perform capacity of EFIS D100 internal emergency
battery (a low battery warning is displayed at a drop
below 13V) - applied for annual inspection only.
API
FH
Perform capacity test of SV-D1000 / SV-HDX1100
internal emergency battery - applied for annual
inspection only.
API
FH
Perform capacity test of Garmin G5 battery - applied
for annual inspection only.
API
FH
13
Heating and Ventilation System
Check cleanness and passage of air inlet holes.
Both
FH
Check line and integrity of the heating and
ventilation system hoses.
Both
FH
Check condition and attachment of the heat
exchanger.
Both
FH
Check functionality of rod and flap.
Both
FH
Check the validity of the CO detector (see also SB-
CR-085, last revision).
100
OH