CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 12 – INSTRUMENTS AND AVIONICS
Date of issue: 2018-09-27
Revision No.: 22
12 - 29
NOTE:
The hose for static pressure line mark by
S
letter and for total pressure mark
by
T
letter.
(c) Connect the wires (10) to the illuminator (3).
(d) Put the instrument (1, 2) and illuminator (3) in position in the panel (11).
(e) Attach the instrument (1, 2) with the illuminator (3) by means of the bolts (4), nuts (5) and
washers (6).
(f) Install the left instrument panel (10).
(g) Carry out check of pitot-static system tightness / Dynon avionics pitot / static test (see
12.4.1, 12.4.2).
12.3.9 Removal of the EFIS D100
Type of maintenance: line
Authorization to perform:
See point 2.5.3.
Tools needed:
-
7/64 Allen wrench
-
cutting pliers
(a) Set the
MASTER BAT
,
AVIONICS
switches to OFF.
(b) Put a 7/64 Allen wrench into the access hole (2, Fig. 12-28) for the locking screw; engage
the screw.
(c) Turn the screw counter-clockwise until the unit disengages from the mounting rack.
CAUTION:
DO NOT PRY THE FACE-PLATE. YOU CAN DAMAGE THE UNIT.
(d) Pull gently on the sides of the unit (1) to remove it from the mounting rack (9).
(e) Remove the cable ties (7) from hoses (5, 6).
(f) Disconnect the hoses (5, 6) of static and total pressure from the rear ports (3, 4) on the unit.
(g) Disconnect the connector (4) from the unit.
(h) Install the protective cover on the rear ports (3, 4) of the unit.