28
The Light /Lock card (SA038) is designed to operate pillar lights or a magnetic or strike lock (lock used
on single swing gates only). The pillar lights will remain on for four minutes after activation. So too a
toggle switch can be connected to the Light/Lock card to switch the pillar lights as and when required.
Place the jumper over the pins MAG or STRIKE when selecting a Magnetic Lock or Strike Lock instal-
CONNECTING A MAGNETIC OR STRIKE TO THE LOCK/LIGHT RELAY BOARD -
(SINGLE SWING ONLY SA038)
STOCK CODE: SA038
MAIN PC CONNECTOR BLOCK
NOTE: THIS LOCK
FEATURE IS NOT ACTIVE
WITH SLIDE
MAG
STRIKE
LIGHT
DANGER:
HIGH
VOLTAGE
Day light
switch
(optional)
230V
Supply
Electric Lock/
Mag Lock
(DuraSwing only)
L
IT
L
O
C
(-
)
(+
)
TOGGLE
SWITCH
(optional)
for manual
pillar light
L
IG
H
T
-L
O
C
K
B
O
A
R
D
W
H
IT
E
P
U
R
P
L
E
B
L
A
C
K
R
E
D
+
1
2
v
(r
e
d
)
G
N
D
(b
la
ck
L
IG
H
T
(w
h
it
e
)
L
O
C
K
(p
u
rp
l
T
o
g
g
le
LIGHT
OUT
LOCK
OUT
IMPORTANT:
Use separate power
supply.
5
All cabling should be in conduit a minimum of 300 mm underground. Ensure that any high voltage
(230V) cables are run in separate conduit.
The transformer should be placed inside the house and then 16 VAC run to the charger module in the
operator. The cable used to run the 16 VAC power should be 1.5 mm three core cable.
Do not use
communication cable
.
Alternatively a registered electrician can run 230V power to the gates and the transformer can be
housed inside the gate operator.
GENERAL SITE LAYOUT
Typical inward swing, pedestal mount operation.
GOOSENECK WITH
INTERCOM (optional)
POST
POST
MASTER
OPERATOR
SLAVE
OPERATOR
INFRARED SAFETY
BEAMS
INTERCOM
HANDSET
16V AC PLUGIN
TRANSFORMER
PEDESTRIAN
KEYSWITCH
3 - CORE CABLE
2 - CORE POWER CABLE
(RECOMMENDED 2.5mm
²)
10 - CORE
COMMUNICATION
CABLE