background image

10

ARRAY MOUNTING OF GROUPS OF 4 UNITS ON A 

PL-40S

 

The groups of 3 or 4 units are easy to transport by truck.

 

Lets see in this section how to mount an array of four units.

 

Firstly, mount the 

AX-AE40S3

 onto the top 

box.

 

To mount the 

AX-AE40S3

 take out the rods 

of the top unit.
 

See the result in the right figure.

 

Next, place the side pieces of the 

AX-

AE40S3

 introducing the security pin like in the 

figure below.

 

Check that the security pins are well 

positioned because they will support the weight 
of the rest of the enclosures.

Rods

Manual de Colgado

 / aero series / 

Rigging Manual

RESULT

PRESS TRIGGER

TO RELEASE
FRONT DOLLY

ONT LINK

FIX ANGLE

0,5º

1,5º

2,5º

STORE

0,5º

REAR LINK

1,5º

2,5º

PRESS TRIGGER

TO RELEASE
FRONT DOLLY

ONT LINK

0,5º

1,5º

2,5º

STORE

0,5º

REAR LINK

1,5º

2,5º

PRESS TRIGGER

TO RELEASE
FRONT DOLLY

ONT LINK

0,5º

REAR LINK

1,5º

2,5º

PRESS TRIGGER

TO RELEASE
FRONT DOLLY

ONT LINK

0,5º

1,5º

2,5º

STORE

0,5º

REAR LINK

1,5º

2,5º

0,5º

1,5º

2,5º

STORE

PRESS TRIGGER

TO RELEASE
FRONT DOLLY

ONT LINK

0,5º

1,5º

2,5º

STORE

0,5º

REAR LINK

1,5º

2,5º

PRESS TRIGGER

TO RELEASE
FRONT DOLLY

ONT LINK

0,5º

1,5º

2,5º

STORE

0,5º

REAR LINK

1,5º

2,5º

PRESS TRIGGER

TO RELEASE
FRONT DOLLY

ONT LINK

0,5º

REAR LINK

1,5º

2,5º

PRESS TRIGGER

TO RELEASE
FRONT DOLLY

ONT LINK

FIX ANGLE

0,5º

1,5º

2,5º

STORE

0,5º

REAR LINK

1,5º

2,5º

0,5º

1,5º

2,5º

STORE

DETAIL

Summary of Contents for Aero Series

Page 1: ...ealizarse utilizando los herrajes de colgado recomendados y por personal cualificado No cuelgue la caja de las asas The appliance should be flown only from the rigging points and by qualified personnel Do not suspend the box from the handles AERO 40A ...

Page 2: ...I Tools for rigging systems ANNEX II Maximum load capacity for AX AE40S3 ANNEX III Advice for EASE Focus 2 use RIGGING SYSTEM PRECAUTIONS ARRAY MOUNTING OF GROUPS OF 4 UNITS ON A PL 40S 4 UNITS MOUNTING ON A PL 40S ARRAY DISASSEMBLY OF GROUPS OF 4 UNITS ON A PL 40S Manual de Colgado aero series Rigging Manual ...

Page 3: ...g ratios must be met 5 1 for steel clable slings 4 1 for steel chain slings and 7 1 for polyester slings Thus an element with a breaking load limit of 1000 kg may be statically loaded with 200 kg 5 1 safety factor and dynamically loaded with 142 kg 7 1 safety factor When a system is flying the working load must be lower than the resistance of each individual flying point in the enclosure as well a...

Page 4: ...l be the first enclosure that we will stack onto the PL 40S If we look at the platform we will see the two security pins on the sides see figure These pins allow to hold the first enclosure to the platform PL 40S Side view of the PL 40S platform Front part of the PL 40S platform Rear part of the PL 40S platform Security pins on the PL 40S platform side Security pins of the PL 40S platform Front vi...

Page 5: ...closure Warning For transport introduce the pin in hole 0º at Rear Link Check that the four security pins are well positioned Front security pin FRONT LINK Front security pin FRONT LINK Final mounting of one enclosure on a PL 40S platform Rear security pins REAR LINK Remember 0º Manual de Colgado aero series Rigging Manual ...

Page 6: ... fix its position in 0º position for transport we will put one of the security pins in the hole FIX ANGLE like in the figure The side control has arrows which mark the selected angle in this case 0º The result platform included can be seen in the figures below 6 Side controls Side controls Rear rods Front rods Security pins Figure of the enclosure on the platform PL 40S with the rods ready to add ...

Page 7: ... the sides of the enclosure and hold the enclosure with them Warning For transport introduce the pin in hole 0º at Rear Link Check that the four security pins are well positioned Figures show final mounting of two enclosures on a PL 40S platform side views Manual de Colgado aero series Rigging Manual ...

Page 8: ... one gently Repeat the process described before Warning For transport introduce the pin in hole0º at Rear Link Check that the four security pins are well positioned You can see the final result in the next figure Manual de Colgado aero series Rigging Manual ...

Page 9: ...process described before Warning For transport introduce the pin in hole 0º at Rear Link Never carry more than four enclosures on the platform Check that the four security pins are well positionated You can see the result in the next figure Manual de Colgado aero series Rigging Manual ...

Page 10: ...LLY ONT LINK 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLLY ONT LINK 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLLY ONT LINK 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE PRESS TRIGGER...

Page 11: ...º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLLY ONT LINK 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLLY ONT LINK FIX ANGLE 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE PRESS TRIGGER TO RELEASE FRONT DOLLY ONT LINK 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE 0º 0 ...

Page 12: ... 5º 7º STORE 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLL Y ONT LINK 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLL Y ONT LINK 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLL Y ONT LINK FIX ANGLE 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE...

Page 13: ...anual PRESS TRIGGER TO RELEASE FRONT DOLL Y RONT LINK FIX ANGLE 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLL Y RONT LINK FIX ANGLE 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º 5º 7º STORE 0º 0 5º 1º REAR LINK 1 5º 2º 2 5º 3º 4º 5º 6º 7º PRESS TRIGGER TO RELEASE FRONT DOLL Y RONT LINK FIX ANGLE 0º 0 5º 1º 1 5º 2º 6º 2 5º 3º 4º...

Page 14: ...ight angle with the side control and introduce again the security pin on FIX ANGLE to fix it 2º in this example 4 Lower carefully and introduce the security pin in REAR LINK and the enclosures will be joined again 3 DETAIL DETAIL Manual de Colgado aero series Rigging Manual 4 ...

Page 15: ...s see another example for more closed angles 0º 0 5º 1 y 1 5º After assigning the angles to the enclosures remove the platform to add more enclosures Remove the security pins and lift the group to add another group of enclosures DETAIL Manual de Colgado aero series Rigging Manual ...

Page 16: ...16 After repeating the process this will be the result of this example once the platform is removed 0º 0 5º 1º 1 5º Manual de Colgado aero series Rigging Manual ...

Page 17: ...X ANGLE 2 We go down the group over the enclosure 5 3 Align the front rods and introduce the security pins in FRONT LINK 4 Place the top group of 4 cabinets over the bottom group Finally introduce the security pins in REAR LINK of enclosure 4 DETAILS Enclosure 1 Enclosure 5 Enclosure 2 Enclosure 6 Enclosure 3 Enclosure 7 Enclosure 4 Enclosure 8 1 2 3 4 Manual de Colgado aero series Rigging Manual ...

Page 18: ... to the top group assign the angles following the EaseFocusinstructions The assignment of the angles and to remove the platform is the same as described before with the first group DETAIL Manual de Colgado aero series Rigging Manual ...

Page 19: ...19 Here you can see the final result for this example with 8 enclosures 0 5º 1º 1 5º 2º 4º 6º 7º 0º Manual de Colgado aero series Rigging Manual ...

Page 20: ... truck In this section you will see how to disassemble an array of 4 units Firstly go down the array and align with the PL 40Splatform as the figures show ARRAY DISASSEMBLY OF GROUPS OF 4 UNITS ON A PL 40S Manual de Colgado aero series Rigging Manual ...

Page 21: ...the security pins in FRONT LINK Figure 3 Support the array over the platform 4 Be careful and avoid accidents Use security gloves and take care with the hands Use the side pins to fix the plate At last introduce the security pins in REAR LINK Figure 5 DETAIL 1 2 4 5 3 1 Manual de Colgado aero series Rigging Manual Side pins ...

Page 22: ...th 0º angulation is easy to transport Note Push the group from the sides Before transport don t forget to hide the top rods Remove the security pin from FIX ANGLE and place it in STORE Referring to the front rod move up the side control and holding it push the rod as you see in the right figure The control will come back automatically to its position Similarly we proceed to remove the rest of the ...

Page 23: ...y and rig it In this case the units will rest over the front platform PL 40 while we join them ARRAY MOUNTING FROM INDIVIDUAL UNITS Add the second enclosure at the desired angle for example 3º Just introduce the security pin in FRONT LINK to join them Manual de Colgado aero series Rigging Manual ...

Page 24: ...e the security pin in FRONT LINK to join them Repeat the process with the rest of the enclosures In this example we have six enclosures with the following angles 3º for second 4º for third 5º for fourth 6º for fifth and 7º for sixth Manual de Colgado aero series Rigging Manual ...

Page 25: ...t enclosure and mount the side pieces of AX AE40S3 Make sure the security pins are well placed Join the lift motor with AX AE40S3 You will need another PICKUP AX AE40S3 if another lift motor is used Manual de Colgado aero series Rigging Manual 0º 3º 4º 5º 6º 7º ...

Page 26: ...do aero series Rigging Manual Place the AX AE40S3 and join it with the security pins to the side pieces of the AX mounted before After checking that security pins are well placed start to lift up the array system slowly ...

Page 27: ...IL Manual de Colgado aero series Rigging Manual While you lift the array introduce the security pins in REAR LINK while the holes are aligned at the desired angles Do this from the first to the last enclosure ...

Page 28: ...al de Colgado aero series Rigging Manual While the enclosures lift from the floor remove the front PL 40 acting over the handles For disassembling follow the instructions described earlier but in a reverse way ...

Page 29: ...0 eCP_20 LINK LINK LINK LINK Example 1 16 AERO 40A 12 LX 218CA DASnet DASnet DASnet Audio Audio Audio IN IN IN IN IN IN OUT OUT OUT OUT OUT OUT OUT OUT OUT IN IN IN 1 2 3 DASnet DASnet DASnet Audio Audio Audio IN IN IN IN IN IN OUT OUT OUT OUT OUT OUT OUT OUT OUT IN IN IN 1 2 3 L1 L2 L3 I o FI40 30mA 4pol FI Schalter 6 x MCB 16A C 1pol 1 x RCD 40A 30mA 4pol Manual de Colgado aero series Rigging Ma...

Page 30: ...ocessors DSP 4080A 4 In 8 Out fully configurable DSP 9 full bandwith parametric band EQ on each Channel AudioCore equipped 1 USB 485 KK Systems USB to RS 485 convertor DASnet Rack 1 Truck Configurations DASNET RACK99 Connections 230 115 V 1 OUT 2 OUT 3 OUT PH 1 PH 2 PH 3 1 OUT 1 OUT 2 OUT 2 OUT 3 OUT 3 OUT MAX 16A per OUT DASNET RACK99 AUDIO IN AUDIO DASNET OUT LINK 1 2 LINK 2 3 LINK 3 4 LINK 4 5 ...

Page 31: ...T OUT OUT OUT OUT OUT IN IN IN 1 2 3 L1 L2 L3 I o FI40 30mA 4pol FI Schalter 6 x MCB 16A C 1pol 1 x RCD 40A 30mA 4pol DASnet DASnet DASnet Audio Audio Audio IN IN IN IN IN IN OUT OUT OUT OUT OUT OUT OUT OUT OUT IN IN IN 1 2 3 DASnet DASnet DASnet Audio Audio Audio IN IN IN IN IN IN OUT OUT OUT OUT OUT OUT OUT OUT OUT IN IN IN 1 2 3 L1 L2 L3 I o FI40 30mA 4pol FI Schalter 6 x MCB 16A C 1pol 1 x RCD...

Page 32: ... 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 2 x UX 221A 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 Speaker cabling ...

Page 33: ...with gll files for acoustic systems The user should be aware that any deviation in the actual installation of the system with respect to the simulated data can affect the system s coverage especially in the long throw Therefore DAS provides clinometers and laser meters to accurately perform the installation of the system Leica Disto D5 Laser Meter Clinometer which is attached to the top cabinet of...

Page 34: ...s 1 to 13 regardless of whether you use a motor or two a maximum of 20 AERO 40A units can be flown At point 14 19 units of AERO 40A can be flown At point 15 18 units of AERO 40A can be flown At point 16 17 units of AERO 40A can be flown At point 17 16 units of AERO 40A can be flown In the image at the right you can see the vertical axis of the center of gravity for the system passing through the p...

Page 35: ...s situated See what happens if we add one more box Now we have a total of 17 AERO 40A units and the software warns us that only 17 units at point 16 or lower can be flown In this case we have 5 57 of inclination the vertical axis of the center of gravity of the system is positioned in alignment with the pick up point number 14 In this case we are within the safety margins Remember that from point ...

Page 36: ... different angles depending on the number of cabinets the angle between them and the pick up point The angle in the software is defined in section View º Inclining systems forwards downwards result in a negative angle The systems inclined upwards result in a positive angle Angle criteria of the cluster 36 Manual de Colgado aero series Rigging Manual 6 AERO 40A a 5º 5º 10º 6 AERO 40A a 10º ...

Page 37: ...red 15 º we are lacking 0 46º when the system is flown at the point 15 If the delta sign is negative this indicates that we are lacking 0 46 downwards If the delta sign is positive this means that we are lacking degrees upwards Angle criteria of delta Now we consider the opposite case This is the same system hanging from a single point 8 AERO 40A units The desired angle View 14 In this case Delta ...

Page 38: ... of gravity is aligned with the pick up point number 13 To what maximum angle could we tilt down the system Suppose we want to hang the system at 17 Let s see what happens in the software Observe how Delta 5 68º This means that we lack to reach the desired 5 68º 17º In this case the system could only have a maximum tilt 17 5 68 11 32 since no further pick up points are available on the AX AE40S3 I...

Page 39: ...88 DAS 4 USA DAS Audio Asia PTE LTD 3 Temasek Avenue Centennial Tower 34 36 Singapore 039190 Tel 65 6549 7760 DAS Audio Group S L C Islas Baleares 24 46988 Fuente del Jarro Valencia SPAIN Tel 34 96 134 0860 DAS do Brasil LTDA Rua Dos Andradas 382 SL Santa Efigênia São Paulo Brasil CEP 01208 000 Tel 551133330764 ...

Reviews: