4
The ‘Pump 1’ and ‘Pump 2’ status lights indicate if the pump heads are running. When the
pump head is running the corresponding indicator will be on and when the pump stops the
indicator will switch off.
Installation
The X2S pump heads are self-priming. When there is big difference between the inlet and
the outlet height, siphoning may occur. To avoid siphoning, the dosing pump should be
placed in a position to ensure that the height difference between the inlet and the outlet is
within 0.5m. The inlet tubes should be as short as possible, and the wastewater outlet tube
should not be submerged.
Please carefully check that the inlet and outlet tube connections are correct on the pump
heads and that the hoses are pushed fully onto any connections.
The pump should be secured into place or installed in a stable location not above open water
or very humid environments.
When installing the auto top up system the anti-syphon connector needs to be positioned
inline on the tube just above the full water level of the freshwater ATO reservoir.
Pipe and Sensor Connection Diagrams
Summary of Contents for Kamoer X2S
Page 1: ...X2S WATER CHANGE PUMP USER MANUAL...
Page 18: ...17...