32
Appendix A Replacing and Upgrading FRUs
A.3 Replacing the Controller Module on the Primary Array
Use the following procedure to replace a controller module on the primary array.
1.
Power down the DSN-5000 series primary array and remove the power cords from the
back panel.
2.
Squeeze down on the top of the levers on either side of the controller module on the
primary array and pull down to disengage the module, then pull the module straight out
of the enclosure.
3.
Install a replacement controller module in the primary array by keeping the levers on
the left and right sides down, then slide the module into the enclosure until you feel it
engage into place.
4.
Replace the power cords and power on the DSN-5000 series primary array.
Figure A-4. Removing the Controller Canister on the Primary Array (Slot #0 shown)
Summary of Contents for xStack Storage DSN-5210
Page 4: ...iv Document Revision Level Revision Date Description Version 1 0 January 27 2009 Version 1 0 ...
Page 8: ...viii Contents This Page Left Intentionally Blank ...
Page 20: ...12 Chapter 2 DSN 5000 Series Primary Array Layout This Page Left Intentionally Blank ...
Page 44: ...36 Appendix A Replacing and Upgrading FRUs This Page Left Intentionally Blank ...