Ceiling Clearance
Verify inlet and outlet grilles are not obstructed to ensure proper air flow.
Confirm location allows condensate to be properly drained.
Confirm height between the bottom of upper deck and top of ceiling is sufficient for installation. (Figure B.6)
Ensure there is sufficient space around the unit to provide installation and service.
Figure B.6
Model
B (mm)
FCSD 1V-01/02
Minimum 10
Condensate Drainage Connection
The unit is fitted with a condensate pump with a maximum of 500mm lift. (Figure B.7.1)
The unit is provided with a ABS drainage outlet.
Confirm drain outlet has not been damaged before connecting drain pipe to unit.
Discharge pipe may be connected with hose clamp. (
Figure B.7.2)
Insulate drain pipe after installation.
Figure B.7.1
Figure B.7.2
Caution
Factory-provided drain outlet is ABS. Using an unsuitable glue may damage the outlet.