2

Preparation

It requires at least four people to assemble a Da-Plex Semi-Rigid. To maintain optimal image geometry and screen alignment, a flat and 
straight wall free from obstructions and angular distortions should be used. 

A wall opening with 5” + the ordered viewing height and 

5” + the ordered viewing width must be used to maintain the precise in-wall fit of the Da-Plex Semi-Rigid.

 When assembling the 

screen, choose a clean work area using padded material or other soft, clean materials. The work area larger than the overall screen size 
and directly in front of or behind the wall opening where the screen is to be installed.

NOTE:

 Please read through the installation steps and note wait times. The rolled screen surface needs to be acclimated to the room for 

48 hours

 prior to installation (Step 1). Once the surface is unrolled it will need to lay in its unrolled state for 

4 hours

 

(Step 2).

Screen Orientation

Polacoat® In-Wall rigid rear projection screens have a polished surface and a matte, coated surface. The polished surface should always 
be installed so that it faces the projector and the matte surface must face the audience. If screen has anti-glare coating, the anti-glare 
surface should always face the projector.

Tools Required for Installation (not provided)

Screw Gun/Drill

1/2" Open Wrenches

(2) Ladders

#10 x 1” Flat Head Screws

¼” x 1” Hex Lag Screws

1/8” & 3/16” Hex Keys

Measuring Tape

Level

Rubber Mallet

Summary of Contents for Polacoat Da-Plex Semi-Rigid

Page 1: ...INSTRUCTION BOOK FOR Polacoat Da Plex Semi Rigid Screen ...

Page 2: ...reen is to be installed NOTE Please read through the installation steps and note wait times The rolled screen surface needs to be acclimated to the room for 48 hours prior to installation Step 1 Once the surface is unrolled it will need to lay in its unrolled state for 4 hours Step 2 Screen Orientation Polacoat In Wall rigid rear projection screens have a polished surface and a matte coated surfac...

Page 3: ... a soft clean lint free cloth Dry Soil Marks Clean with VM P Naptha or with Da Lite Lenskleen and a soft clean lint free cloth Cleaning of Frame and Trim The exposed surfaces of the aluminum frames can be cleaned with a dilute solution of detergent and water followed by a clear water rinse Use a soft grit free cloth to preserve the anodized finish Protect screen surface during frame cleaning Do no...

Page 4: ...nrolling the screen ensure that the edge end of the surface is nearest to the floor While maintaining slight pressure on the roll cut each piece of tape wrapped around the roll at the edge end of the surface Once all tape pieces have been cut the screen surface can be unrolled This should be done gently and in at a measured pace to prevent damage to the surface There will be elastic potential ener...

Page 5: ...g the other 4 piece of trim as a guide secure the opposite end of the T track section on the end hole with a 10 screw Once both ends are attached slide the 4 trim pieces along the track to align the other positions and attach a 10 screw into the hole openings until completed See Figure 2 NOTE Sliding the trim along the T track will maintain the proper alignment when attaching the T track to the wa...

Page 6: ...ection of the screen in the opposite corner See Figure 4 8 Position the third lifting bracket 2 from the back of the T track in the center of the top section of the wall opening and mount with 1 4 X 1 lag screws See Figure 4 NOTE After completing this step there should be three lifting brackets mounted into the top section of the wall opening behind the T track Check that these brackets are secure...

Page 7: ... sections around the screen surface Attach to frame over the rubber gasket with set screws facing upwards Use a rubber mallet to gently tap the screen frame into place if needed See Figure 5 12 Starting from the center on each side tighten all set screws on all four sides of the frame using the 1 8 hex key Approximately two threads should be visible on each set screw when properly tightened 13 Pla...

Page 8: ...s being lifted WARNING Do not lift the screen into place if the ropes have not been fed through the hoisting and lifting brackets Figure 6 Figure 7 16 Lift the screen assembly to a vertical position on the floor parallel to the wall opening On the projector side of the wall opening one person will be holding all three ropes without slack and guiding the screen to an upright position On the audienc...

Page 9: ...rson should be on a ladder on the projector side helping the rope control and lifters guide the screen assembly into place until all three hoisting and lifting brackets attach to each other at the top of the wall opening See Figure 8 NOTE During this step be careful not to touch the projection coating on the audience facing side of the screen assembly along the screen edges NOTE At the end of this...

Page 10: ...hed tensioning assemblies 21 Tighten the remaining tensioning assemblies on the top section of the screen assembly until all eight four per frame section are evenly spaced and secure on the top side NOTE Use the alternating method of two to three turns on one assembly then moving on to another assembly to prevent the bolts and nuts from binding 22 At the bottom section align the T track and the fr...

Page 11: ...11 ...

Page 12: ...ite transportation expenses to and from Da Lite are payable by the purchaser and Da Lite is not responsible for damage in shipment To protect yourself against damage or loss in transit insure the product and prepay all transportation expenses TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING WARRANTIES AS TO FITNESS FOR ...

Reviews: