4
Electrical Installation
1. Open the junction box on the left end of the case using a
#2 Phillips screwdriver. Install electrical connections that
apply to your unit. Make sure to review the wiring diagram
for proper hook up. Replace the junction box cover.
NOTE:
Must be installed in accordance with the
requirements of the Local Building Codes, the Canadian
Electrical Code (CEC), CAN/CSA C22.1 and the National
Electric Code (NEC), NFPA 70.
2. Test installation by running screen up and down a few times.
Be prepared to stop screen should any objects obstruct the
movement of the screen. To prevent damage to the motor,
the standard duty cycle is 1 minute on and 3 minutes off.
Figure 5
Junction
Box Cover
Installation (continued)
Ceiling Hook Bracket
1/4 X 5/8"
Flat Head Screw
Figure 4
Ceiling Hook Mount
1. The ceiling hook mount brackets are tied together and
attached to the ceiling flush mount bracket at one end of
the case. Remove the ceiling hook mount brackets.
2. Remove the ceiling flush mount brackets using a #2 Phillips
screwdriver. See Figure 3. Retain four 1/4”x 5/8” screws.
NOTE:
Do not remove the wall mount bracket, even if you
are
not using it for mounting. This provides structural stability
to the case.
3. The top of the screen case has two channels with threaded
nuts that slide the length of the case. Attach the two ceiling
hook mount brackets using the 1/4”x 5/8” screws and
threaded nuts, two per bracket. The brackets can be
attached anywhere within 12" of the ends of the case (Figure
4).
4. Before hanging your Tensioned Contour Electrol, be sure
the ceiling has adequate reinforcement.
5. Using the holes in the ceiling hook brackets, hang the
Tensioned Contour Electrol using the appropriate hardware
and fasteners for your ceiling type.