DAC Monitoring and Control System
User Manual Data Logger and Tower Meter
DL-PDL_General-User-Manual
_ve_2-0-2.docx
Page 104
18.3.3 User Interaction with Hybrid cable Test Box:
The test box for the Hybrid Cable can be ordered, please contact the DAC System office.
Choose S1 for the
fibre communication
port.
Choose the
baud rate:
57600
Start and
stop the
test.
After the pressing the “start” button
the test is continuously running.
The test bytes are compared and
the result is shown.
Test
failed
Test
succeeded
Select the test pattern.
Choosing the Modbus Option allows
the test of a daisy chain Configuration.
Press “stop” button to stop the test
and start again to verify the results.
Press “stop” button to finalize
test
and return to configuration
menu.