DAC Monitoring and Control System
User Manual Data Logger and Tower Meter
DL-PDL_General-User-Manual
_ve_2-0-2.docx
Page 15
8.4 Data Logger and Tower Meter interfaces
Front view Data Logger DL:
Front view Tower Meter PDL:
To commission the Monitoring System the DL/PDL is installed acc. to chapter 0.
After the DL/PDL is powered the hybrid connector or RS 485 is inserted.
On the front of the DL/PDL is the green LED OPR/Power on: DL/PDL is powered (takes
2 minutes after power is connected to start the OS and initialize the SW system).
The yellow LED F1/Poll is blinking: the communication with the JB is working.
Please follow now the following steps to configure the Monitoring System on site.
IO Interface
GSM antenna
SMA connector
Ethernet
interface to
connect to
operator data
network
IO Interface
Local Ethernet
port to connect
the Laptop
Status LED:
Green “Operating”: DL is powered and
SW system is up and running
Red “Alarm”: the DL has an alarm
Yellow “F1”: blinking - com. with JB
(polling)
Yellow “F2”: blinking - communication
with the Analytics-SW
The other interfaces are
not used for the DL
operation.
Ethernet
interface to
connect the
ATSB for
permanent
operation or for
initial set-up
and change of
IP address.
GSM antenna
SMA connector
Ethernet
interface to
connect to
operator data
network
Local Ethernet
port to connect
the Laptop
Status LED:
Green “Power”: PDL is powered
Red “Alarm”: the PDL has an alarm
Yellow “Oper”: SW System up and
running
Yellow “Poll”: blinking –
communication with JB (polling)
The other interfaces are
not used for the PDL
operation.
Ethernet
interface to
connect the
ATSB for
permanent
operation or for
initial set-up
and change of
IP address.
5 inch touch
screen display