English
44
Installation instructions
Installation instructions
Installing the power cord
Strain relief
Power cord
Conduit connection
plate
For power cord installations, hook the
strain relief over the power cord hole (1⅜")
located below the rear of the drawer body.
Insert the power cord through the strain
relief and tighten the device.
• You must install the power cord with a
strain relief.
• Attach the strain relief to the 1⅜"
opening in conduit connection plate.
Installing a 3-wire power cord
WARNING
The neutral or ground wire of the power cord must be connected to the neutral terminal
located in the center of the terminal block. The power leads must be connected to the
lower left and the lower right terminals of the terminal block.
Ground strap
Neutral
terminal
Black
White
Red
Black
White
Red
1.
Remove the 3 lower terminal screws
from the terminal block.
2.
Insert the 3 terminal screws through
each power cord terminal ring and into
the lower terminals of the terminal
block. Be certain that the center wire
(white/neutral) is connected to the
center lower position of the terminal
block.
3.
Tighten screws securely into the
terminal block.
DO NOT remove the
ground strap connection.
Install_NY9900M_PRORANGE_DOP48M96DLM_DA_DG68-00936A-00_EN+MES+CFR.indb 44
2017-05-12 7:36:50