English
20
Installation instructions
Installation instructions
Verify warming drawer operation
1.
Plug in the unit.
2.
Open the drawer, and press POWER on the control panel.
3.
(
Temperature
section) One after the other, press Bread Proof, Low, Med, and High. As
you press each function, the indicator above it should light.
4.
Leave the control panel set to High.
5.
(
Duration
section) Press -, +, and +1hr. Verify that the timer display is correct.
6.
Within 5 – 10 minutes, you should feel heat from the drawer interior.
7.
Having determined that the heating element works, press POWER to shut off the unit.
•
If the unit does not operate properly, v
erify that the circuit breaker is on
and
the
unit is plugged in, then r
epeat the above
procedure
.
•
If the
unit
still does not work, contact an authorized Dacor service
r: (800) 793-0093.
•
Do not
try
to repair the
unit
yourself. Dacor is not responsible for service required
to correct a faulty installation.
Summary of Contents for DWR30M977WS
Page 12: ...English 12 Installation requirements Installation requirements Cutout Cleat dimensions...
Page 21: ...MEMO...
Page 22: ...MEMO...
Page 23: ...MEMO...