6 English
Installation Requirements
Installing the Support Platform
Drawer
Front
face
Support
platform
Edge
of the
platform
Provide a platform (100-lb. load capacity)
within the cabinet upon which the
warming drawer will be supported;
3/4" (1.9 cm) thick plywood is
recommended. The platform must be
installed level and straight. (No provision
is made for leveling the drawer after
installation.)
NOTE
If the drawer is installed out of level, it
may slide open on its own or may not seal
tightly, thus limiting the drawer's ability to
warm food.
The top edge of the platform must be flush
with the cutout at the front of the cabinet.
Electrical / Environmental Specifications
WARNING
IMPORTANT
: This appliance is equipped with a 3-prong grounding electric
plug for protection against possible electric shock hazards. It must be plugged
into a dedicated, grounded, electrical outlet. If only a 2-prong electrical outlet
is available, it is the responsibility of the customer to have it replaced with a
dedicated, properly grounded 3-prong electrical outlet.
NOTE
Use of a ground fault interrupter (GFI) is not recommended.
Flushed cabinet dimensions
Dimensions provide minimum reveals.
* For DWR30U900WP model, it is the custom front panel depth.
If the custom front panel depth is 3/4", this dimension is 3/4" + 5/16" = 1 1/16".
** Due to the tolerance, it is recommended to measure the actual product and
reflect it in the furniture cabinet
28 ½"
(72.4 cm)
Drawer Front Depth*
+ 5/16”**(0.8 cm)
30 ¼"
(76.7 cm)
Cleat
25"
(63.5 cm)
9 13/16"
(24.8 cm)
7/8" (2.2 cm)
Cleat width
Support
Platform
7/32"
(0.6 cm)
7/16" (1.0 cm)
Cleat width
9 1/8"
(23.2 cm)
120 Vac
electrical
outlet
Drawer Front Depth*
+ 5/16”**(0.8 cm)
Top View
Side View
Front View
DG68-01562A-00_IM_DWR30U900WMES+CFR.indb 6
DG68-01562A-00_IM_DWR30U900WMES+CFR.indb 6
2023-06-13 오전 9:13:02
2023-06-13 오전 9:13:02