Page 3-7
s
eCTion
3 - s
erviCe
d
iagnosTiCs
Service Test 16 – Compressor Maximum Speed
This test will energize the compressor at maximum speed.
The compressor should have been off for at least five minutes
prior to this test. If the off time is not five minutes, the short
cycle protection within the compressor controller will prevent
operation until enough time has elapsed.
The Service Test may time out (three minutes) before sufficient
time has elapsed for the compressor to start. If the display
changes back to this display (16 00) reactivate the test.
Pressing the Power Interrupt Button will start the compressor
at maximum speed. The display will show the current
evaporator temperature on the fresh food side of the display.
If the compressor is working, this temperature should quickly
drop.
If the compressor does not eventually start after waiting for at
least five minutes check for the following conditions:
JP10, pins 1 to 2, 2-2.5VAC this is the drive signal from the
Main Control Board to the Compressor Controller.
CN 05 pins 1 to 6, 230VAC, this is the output from the
compressor controller to the compressor.
Service Test 17 – Compressor Minimum Speed
This test will energize the compressor at minimum speed.
The compressor should have been off for at least five minutes
prior to this test. If the off time is not five minutes, the short
cycle protection within the compressor controller will prevent
operation until enough time has elapsed.
The Service Test may time out (three minutes) before sufficient
time has elapsed for the compressor to start. If the display
changes back to this display (17 00) reactivate the test.
Pressing the Power Interrupt Button will start the compressor
at minimum speed. The display will show the current
evaporator temperature on the fresh food side of the display.
If the compressor is working, this temperature should quickly
drop.
If the compressor does not eventually start after waiting for at
least five minutes check for the following conditions:
JP10, pins 1 to 2, 2-2.5VAC this is the drive signal from the
Main Control Board to the Compressor Controller.
CN 05 pins 1 to 6, 130VAC, this is the output from the
compressor controller to the compressor.
•
•
•
•
SERVICE
SERVICE