background image

Frame and Foundation Assembly

2 – End Bar

1 – Top Bar

1 – Bottom Bar

8 – 11/4” Nails

4 – 3/4” Nails (to attach wedge)

1. Nail the side rails to the Bottom Boards using 

the 21/4” nails.

2. Nail the Top Cleat to the top of the Bottom 

Board using the 11/4” nails.

3. Nail the Bottom Cleat to the bottom of the 

Bottom Board using the 3/4” nails.

(See figure 5 for assembling Bottom Board.)

Bottom Board

1 – Top Cleat

1 – Bottom Cleat

2 – Side Rails

1 – Bottom Boards

4 – 11/4” Nails

16 – 21/4” Nails

4 – 3/4” Nails

End Bar

Top Bar

Top Bar

End Bar

Top Cleat

Figure 4

Figure 5

Bottom Cleat

Side Rail

Side Rail

Bottom Boards

Foundation sold 

separately

1. Assemble Frame using two 11/4” nails in each 

corner.

2. Insert Foundation (sold separately) into slot in 

Bottom Bar.

3. Place wedge at top of foundation and nail to 

top bar.

(See figure 4 for assembling frames.)

Reviews: