56
6
-
3-point hitch implement And loAder operAtion
Never use any other part for
pulling except draw bar. Pull-
ing with top link, ROPs and
etc. will cause a fatal accident.
Be sure to install the auxiliary
safety chain when installing a
trailer.
Improper use of the draw-bar,
even if correctly positioned,
can cause a rear overturn.
Do not overload an imple-
ment or towed equipment.
use proper counterweights to
maintain tractor stability. Hitch
heavy loads to the draw-bar
only.
Make sure that there is no one
nor object between the tractor
and trailer.
•
•
•
•
•
wARNINg
sPECIfICATION
S43O120B
(1) pto shaft cover
(2) pto shaft cap
Before you install the some kind of
implement, take off pto shaft cap(2)
and install the universal joint of im-
plement.
if necessary, fold up the pto shield
guard (1).
PTO & PTO sHIELD guARD
PTO type Nominal
diameter
Number and
type
of splines
Nominal PTO
rated rotational
frequency
Recommended PTO
power at rated engine
speed(kw)
1
35
6 straight
splines
540
up to 25
750
PTO sheild guard
Category
Regulation
t1
compliance with iso 500-1
TC220-영문-유럽,호주향-OM-06.indd 7
2018-01-05 오후 5:56:22
Summary of Contents for CK3520
Page 12: ...TC220 OM 00 indd 12 2018 01 15 1 12 16...
Page 40: ...1 28 CK3520 CK4020 CK4220 T22O102b TC220 OM 01 indd 28 2018 01 15 1 29 57...
Page 41: ...1 29 For safe operation 1 t22o103a ROPS TC220 OM 01 indd 29 2018 01 15 1 29 59...
Page 42: ...1 30 CK3520 CK4020 CK4220 T22O104a TC220 OM 01 indd 30 2018 01 15 1 30 01...
Page 168: ...MEMO MEMO TC220 OM 06 indd 18 2018 01 05 5 56 29...
Page 218: ...MEMO MEMO TC220 OM 07 indd 50 2018 01 15 1 12 51...
Page 229: ...10 10 INDEX INDEX 10 2 TC220 OM 10 indd 1 2018 01 15 1 16 04...