9-4 Disassembly of Transmission
Remove gear change lever (1 bolt).
Loosen speedometer cable mounting nut, and then
remove the cable.
Remove 3 bolts and remove drive chain protector.
Turn the socket bolt clockwise, and then remove
speedometer gear box.
Caution
The socket bolt is provided with left turn
thread.
Remove 2 bolts, and then remo ve the drive
sprocket fixing plate, drive chain and drive
sprocket.
Remove gear fill bolt.
Place an oil pan under the ATV, and remove gear
oil drain bolt.
After drained, make sure washer can be re- used.
Install oil drain bolt.
Torque value:
Gear oil fill bolt
3.5~4.5kgf-m
Gear oil drain bolt
0.8~1.2kgf-m
1 bolt
Fill bolt
Drain bolt
Speedometer cable
Socket bolt
3 bolts
2 bolts
Summary of Contents for ET-250
Page 1: ...1 ET 250...
Page 51: ...Use 32 cutter to cut a quarter upper parts out...
Page 54: ......
Page 60: ...7 1 Mechanism Diagram 0 8 1 2kgf m 1 0 1 4kgf m...
Page 67: ...7 7 Cylinder Installation Install dowel pins and new gasket Dowel pins...
Page 96: ...10 1 Mechanism Diagram 5 0 6 0kgf m 1 0 1 4kgf m 0 8 1 2kgf m...
Page 140: ...REAR BRAKE...
Page 158: ......
Page 159: ...17 8 WIRING DIAGRAM...