5-8 Adjustment Of Idle Speed
Caution
y
Inspection & adjustment for idle speed have to
be performed after all parts in engine that
needed adjustment have been adjusted.
y
Idle speed check and adjustment have to be
done after engine is being warm up. (It is
enough that operates engine from stop to
running for 10 minutes.)
Park the ATV warm up engine.
Connect tachometer (the wire clamp of tachometer
is connected to the high tension cable).
Turn the throttle valve stopper screw to specified
idle speed.
Specified idle speed: 1700 ± 100 rpm
Emission adjustment in idle speed
Warm up the engine for around 10 minutes and
then conduct this adjustment.
1. Connect the tachometer onto engine.
2. Adjust the throttle valve stopper screw and let
engine runs in 1600±100 rpm.
3. Insert the exhaust sampling pipe of exhaust
analyzer into the front section of exhaust pipe.
Adjust the air adjustment screw so that
emission value in idle speed is within standard.
4. Slightly accelerate the throttle valve and
release it immediately. Repeat this for 2~3
times.
5. Read engine RPM and value on the exhaust
analyzer. Repeat step 2 to step 4 procedures
until measured value within standard.
Emission standard
CO: below 0,8~1.5%
HC: below 900ppm
Ignition cable
Stopper screw
Air adjustment screw
Summary of Contents for ET300 - SERVICE
Page 1: ...1 ET 300 Service Manual ...
Page 142: ...REAR BRAKE ...
Page 160: ......
Page 161: ...17 8 Wiring Diagram ...