Part name & Treatment for each device
1. Control panel
1. Operation & Pre-heater switch
2. Blower air control switch
3. Indoor TEMP. setting switch
4. Power operation lamp
5. Oil buzzer lamp
6. COMP. Buzzer lamp
7. Battery charging lamp
8. Cold water buzzer lamp
2. Function of each switch
1) Operation & Pre-heater switch
The organization of switch is dumbuler switch as
2 stage, heat ON is using for pre-heating to glow
plug, start ON is using for engine operation of AIR
-CON.
(Do not use it for more than 10 sec. At pre-heater
& for more than 3 sec. at operating)
2) Blower air control switch
The switch is used at air control of AIR-CON blow-
er & engine stop as 5 stages.
1 OFF : at AIR-CON stop.
2 LOW : The air of AIR-CON blower is operated at
LOW.(60% of total air)
3 MID : The air of AIR-CON blower is operated at
MID.(80% of total air)
4 HIGH : The air of AIR-CON blower is operated
at HIGH.(100% of total air)
5 AUTO : Blower AIR-CON is controlled automati-
cally depending on INDOOR & SETTING
TEMP.(3 stage control of auto air)
OIL
COMP
15
30
HIGH
AUT
O
MID
LOW
OFF
HEAT
(10sec)
START
(3sec)
ROOM TEMP(¡C)
POWER
BAT WATER
1
2
3
7
5
4
6
8
COOLER (ROOF-ON TYPE W/POWER PACK) (OPTION)
Summary of Contents for BH090
Page 220: ...218 Drag link RR 2 points For leaf spring Spring and shackle pin 12 points...
Page 255: ...253 BODY DIMENSION BM090 ROOF ON COOLER NON COOLER APPROX APPROX...
Page 256: ...254 BS090...
Page 259: ...257 ROOF ON COOLER SUB ENG COOLER NON COOLER APPROX APPROX BH115E...
Page 260: ...258 ROOF ON COOLER SUB ENG COOLER APPROX APPROX BH120E...