15
TOP PLATE
INSERT POINTS
Fig.3-6 ASSEMBLY OF THE F/L ASS’Y
NOTE:
Reassemble the FRONT LOADING MECHANISM in the reverse order. Confirm that the two bosses
on the left side of the CASSETTE HOLDER AS are inserted into the groove on the left side of the top
plate. Insert the two bosses on the right side of the cassette holder into the groove of the F/L
BRAKCET R (Fig. 3-6)
3-3. DRUM ASS’Y/EARTH BRACKET ASS’Y REMOVAL
(See Fig.3-7)
a. Remove three screws
¤
fixing the DRUM
TOTAL ASSEMBLY.
b. Remove the EARTH BRACKET ASSEMBLY
¤Ł
.
c. Carefully lift the DRUM TOTAL ASSEMBLY
¤Ø
from the DECK MECHANISM, taking care not to
damage or touch the VIDEO HEAD.
NOTE:
ƒU
After assembling the DRUM TOTAL
ASSEMBLY, confirm that the TAPE runs
smooth and refer to chapter 5
"ADJUSTMENT OF THE TAPE
TRANSPORTING SYSTEM".
ƒU
When assembling the EARTH BRACKET
ASSEMBLY, a 3x12 screw should be
used and at the other parts, 3x10 screws
should be used.
Fig.3-7 DRUM TOTAL ASS’Y
&
EARTH BRKT
ASS’Y REMOVAL
Summary of Contents for K-MECHA DECK
Page 1: ......
Page 4: ...3 1 2 1 WIRE DIAGRAM 1 2 WIRE DIAGRAM ...
Page 8: ...7 2 1 2 PARTS LOCATION OF FRONT LOADING ASS Y A TOP VIEW B FRONT VIEW ...
Page 38: ...37 6 EXPLODED VIEW AND PA RTS LIST 6 1 EXPLODED VIEW OF DECK ASS Y TOP VIEW AC001 ...
Page 39: ...38 6 2 EXPLODED VIEW OF DECK ASS Y BOTTOM VIEW ...
Page 40: ...39 6 3 EXPLODED VIEW OF F L ASS Y ...
Page 41: ...40 ...
Page 48: ...S022GBB ...