Page 23
Specifications for Solar 200W-V
Return to Master Table of Contents
TESTS
Evaluation of equ ipment pe rformance and ope rating condition can be made b y running the excavator
through a s eries of di fferent tests, and r ecording results with a st op watch and tape measure. Compare
results of performance tests against the specifications and standards, which are for equipment in new or
renewed condition.
TEST CONDITIONS
1.
All tests should be performed on a flat, level, firmly supporting ground surface.
2.
All r ecommended, ap plicable ma intenance an d adj ustment s ervice s hould b e c ompleted p rior t o
testing.
3.
Hydraulic fluid and engine oi l sh ould be of ap propriate viscosity f or ambient weather conditions.
Warm up hydraulic oil to standard operating temperature, between 45° to 55°C (112° to 135°F).
4.
Run all tests with the engine speed control set to maximum RPM.
5.
Repeat tests with Power Mode engine control settings at both Power Mode S (standard work mode)
and Power Mode H (high speed mode). Travel speed tests should also be repeated at both high and
low speed.
HAAA7960
Figure 5
Summary of Contents for Solar 200W-V
Page 1: ...Shop Manual 2023 7139E Serial Number 0001 and Up March 2000 Solar 200W V...
Page 3: ......
Page 6: ...Return to Master Table of Contents 1SAFETY...
Page 28: ...S0102020 Page 22 Wheel Excavator Safety Return to Master Table of Contents...
Page 29: ...Return to Master Table of Contents 1SPECIFICATIONS...
Page 30: ...Return to Master Table of Contents...
Page 37: ...S0202040 Page 7 Specifications for Solar 200W V Return to Master Table of Contents...
Page 57: ...Return to Master Table of Contents 1GENERAL MAINTENANCE...
Page 58: ...Return to Master Table of Contents...
Page 72: ...S0302000 Page 14 General Maintenance Procedures Return to Master Table of Contents...
Page 85: ...Return to Master Table of Contents 1UPPER STRUCTURE...