3. Operation
VMCTOPES8D51
3.1 Power on
As the process preparing to operate the machine, there can be some differences in the actual
action by operating devices.
1) Main power on
2) Machine ready
Step
Operation
Location
Remark
1
Check the machine
state and interference
Machine
– Refer to precautions/
instruction manual
2
Main N.F.B. switch ON
Electric
cabinet
– Spindle fan ON
– Work light avail-
able
– Monitor ON
– Lub. pump ON
– Cooling fan ON
Step
Operation
Location
Remark
1
Release Emergency
stop switch
Main OP. panel
ATC OP. panel
– Check other
switch for Option
2
Push machine ready
button
Main OP. panel
– Flikering and light-
ing
Power on
3 – 1
2
1
2