Chapter 6 Memory Design Management
The system will hint user to input the new design number and the new design name.
8.
Click
to save or click
to cancel the operation and return
to the design operation selection interface.
6.10 Compile Combined Design
The action will help to turn the combined design to normal embroidery design.
1.
Click
in the main menu to enter the memory design management interface.
2.
Select the combined design that has been saved.
3.
Click
to enter the memory operation selection interface.
4.
Click “Compile Combine Design” to enter its operation interface.
System asks user to input new design number and new name.
Owner’s Manual of BECS- 285A Computerized Control System
63