Chapter 11 About JF Sequin Embroidery
11.8
Debugging Multi-Sequin Embroidery
Location of Sequin Switch Board
1. Operation of Sequin Switch
(1) Manual Operation for Front Motor Sending A Sequin
Put the sequin switch to the down position, dial the thread-breakage detection switch to
turn on the green indicator and press manual sequin-feeding button.
(2) Manual Operation for Middle Motor Sending B Sequin
Put the sequin switch to the down position, dial the thread-breakage detection switch to
turn on the red indicator and press manual sequin-feeding button.
(3) Manual Operation for Rear Motor Sending C Sequin
Put the sequin switch to the down position, dial the thread-breakage detection switch to
turn off the head indicator (dial it to down position too) and press manual sequin-feeding
button.
Note: In order to debug the multi-sequin function, user needs to install an external head
switch on the single head machine.
2. Debugging Menu of Sequin
Press
in the main interface, then press “machine debugging”. Then press “Sequin
Device Operations” to show the following image:
:
122 Owner’s Manual of BECS- 285A Computerized Control System