FLIGHT INTO KNOWN ICING CONDITIONS (2/5)
Ice accumulation thickness is monitored by the pilot on the L.H. wing leading
edge.
At night, a leading edge icing inspection light located on the fuselage
L.H. side, activated by the ”ICE LIGHT” switch, is provided.
Boots are automatically cycling at the optimum time to assure proper ice
removal. Correct operation of the system can be checked observing the
corresponding green advisory light illumination at each boot inflation
impulse. If correct operation cannot be confirmed, do not enter or leave as
soon as possible icing conditions.
Apply ”LEADING EDGES DEICING FAILURE” emergency procedure.
Ice protection procedures
1 -- Prior to entering IMC, as a preventive :
If 0
°
C < OAT <+ 13
°
C :
-- ”PROP DE ICE” switch
ON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-- ”INERT SEP” switch
ON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
If -- 15
°
C < OAT < 0
°
C :
-- All ”DE ICE SYSTEM” switches
ON
. . . . . . . . . . . . . . . . . . . . . . . . .
-- ”IGNITION” switch
ON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-- ”INERT SEP” switch
ON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
If -- 25
°
C < OAT < -- 15
°
C :
-- All ”DE ICE SYSTEM” switches
ON
. . . . . . . . . . . . . . . . . . . . . . . . .
-- ”INERT SEP” switch
ON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
If OAT < -- 25
°
C :
-- ”PROP DE ICE” switch
ON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-- ”INERT SEP” switch
ON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
If icing conditions are foreseen, particularly check good functioning of all
electrical and pneumatic ice protection systems.
When OAT is below -- 25
°
C, avoid operations of the ”AIRFRAME DEICE
SYSTEM” for a too long period because the boots could be damaged. The
”INERT SEP” switch must be left ON while the airplane remains in icing
conditions.
PIM - DO NOT USE FOR FLIGHT OPERATIONS
Summary of Contents for TBM 850
Page 1: ...PILOT S INFORMATION MANUAL TBM 850 Edition 1 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 142: ...3 1 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 146: ...3 2 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 150: ...3 3 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 164: ...3 4 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 170: ...3 5 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 178: ...3 6 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 184: ...3 7 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 196: ...3 8 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 202: ...3 9 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 216: ...3 10 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 228: ...3 11 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 236: ...3 12 PIM DO NOT USE FOR FLIGHT OPERATIONS ...