SUPPLEMENT 69
BARO--VNAV APPROACHES
T B M
850
Edition 1 -- September 30, 2018
Rev. 0
Page 9.69.3
--
is, as installed in this airplane, approved for navigation using GPS and
GPS/SBAS (within the coverage of a SBAS complying with ICAO
Annex 10) for IFR enroute, terminal area, and RNP APCH operations
(to LNAV, LNAV/VNAV and LPV minima).
--
is, as installed in this airplane, complying with the equipment,
performance, and functional requirements to conduct RNAV and RNP
operations in accordance with the applicable requirements of the
reference documents listed in the following table.
NOTE :
Depending on the area of navigation, an operational approval may be
required to use the navigation performance that are detailed in the table
hereafter. The pilot is responsible to ensure compliance with current
operational requirements.
This table is accurate at the time it was published.
Phase of flight
Approved
PBN
Capability
Operational limitations
Reference
Documents
ICAO Flight
Plan Code
Notes
Item
10a
Code
Item
18
PBN/
En-route,
Oceanic
and
Remote continental
(Class II Navigation)
RNAV 10
RNP 10
GNSS
FDE
availability
must be verified prior to
flight. Maximum predicted
FDE
unavailability
is
34 minutes.
1
Two GNSS systems requi-
red to be operational.
2
FAA
AC 90-105A
R
A1
Additional
com-
munication
and
surveillance
equipment
may
be
required
to
obtain
ope-
rational approval
to utilize RNP 10 /
RNAV 10 perfor-
mance.
En-route continental,
Arrival
RNAV 5
(
formerly
desig-
nated as
B-RNAV)
One GNSS system requi-
red to be operational.
JAA
AMJ 20X2
R
B2
En-route,
Oceanic
and
Remote continental
(Class II Navigation)
RNP 4
GNSS
FDE
availability
must be verified prior to
flight. Maximum predicted
FDE
unavailability
is
25 minutes.
1
Two GNSS systems requi-
red to be operational.
2
FAA
AC 90-105A
R
L1
Additional
com-
munication
and
surveillance
equipment
may
be
required
to
obtain
ope-
rational approval
to utilize RNP 4
performance.
PIM - DO NOT USE FOR FLIGHT OPERATIONS
Summary of Contents for TBM 850
Page 1: ...PILOT S INFORMATION MANUAL TBM 850 Edition 1 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 142: ...3 1 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 146: ...3 2 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 150: ...3 3 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 164: ...3 4 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 170: ...3 5 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 178: ...3 6 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 184: ...3 7 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 196: ...3 8 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 202: ...3 9 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 216: ...3 10 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 228: ...3 11 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 236: ...3 12 PIM DO NOT USE FOR FLIGHT OPERATIONS ...