T B M
PILOT’S OPERATING HANDBOOK
850
SECTION 7
DESCRIPTION
Page 7.3.36
Edition 1 -- June 22, 2007
Rev. 12
Post--MOD 70--0315--25 with 4--seat accommodation
Two cargo nets are available for the pilot to safely secure and transport
baggage :
-- the Small Cargo Net is attached through nine anchoring points on seat
rails, between frame C11 and frame C13bis (Figure 7.2.1B).
-- the Large Cargo Net is attached through seven anchoring points on seat
rails, between frame C11 and frame C13bis and six anchoring points on
fuselage sides, at frame C14 (Figure 7.2.1A).
NOTE :
Original Partition Net must be disconnected from side walls and placed on
the floor.
PIM - DO NOT USE FOR FLIGHT OPERATIONS
Summary of Contents for TBM 850
Page 1: ...PILOT S INFORMATION MANUAL TBM 850 Edition 1 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 142: ...3 1 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 146: ...3 2 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 150: ...3 3 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 164: ...3 4 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 170: ...3 5 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 178: ...3 6 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 184: ...3 7 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 196: ...3 8 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 202: ...3 9 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 216: ...3 10 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 228: ...3 11 PIM DO NOT USE FOR FLIGHT OPERATIONS ...
Page 236: ...3 12 PIM DO NOT USE FOR FLIGHT OPERATIONS ...